OMEXOM draws up and implements a functional tests specific methodology, for each high voltage transformation installation. The two-fold skill (turnkey equipment supplier-installer) enables
OMEXOM's teams to carry out functional trials on the complete chain, from the high voltage gear to the control equipment.
The methodology is based on the drafting of specific inspection procedures as a complement to the trials carried out by the manufacturers:

Visual inspection of the installations and groundings of the low voltage cables and equipment,
Inspection of conformity of AC and DC power supplies and the functional links,
Selective functional inspection,
Test of each cable by at least one data transmission operation.

These tests are carried out on the site on final completion of the installation.
Their main objectives are:

To improve the global quality of the service provided,
To reduce commissioning time.