Timeline
-
2025
Comissioning of the complex Salzburgleitung 400-kV transmission line project in Austria, built by Omexom with numerous measures to protect the sensitive alpine environment.
-
2024
Omexom constructs a 105-km, 90-kV high-voltage transmission line to help increase the network’s reliability and bring electricity to around 150 localities in the East Region of Cameroon.
-
2023
For the Serra do Assuruá wind power complex in Gentio do Ouro, Brazil, Omexom builds a 28-km, 230-kV transmission line with 846 MW capacity, providing the nation’s largest renewable energy flow.
-
2023
Omexom completes 110-kilovolt cabling project in Savonlinna: the largest freshwater high voltage cabling project and the largest cable run in Finland.
-
2022
Omexom builds the Muara Karang 500-kV GIS substation in North Jakarta, Indonesia
-
2022
Omexom builds largest Battery Energy Storage System (BESS) Facility in France
-
2021
Omexom builds floating solar farm on decomissioned mining site, a renewable energy asset for the community of Peyrolles-in-Provence.
-
2021
Omexom completes the first digital substation on the African continent in Thiès, 70 km from Dakar, Senegal
-
2020
Omexom builds first commercial solar farms in Ireland: Millvale, Knockanally and Hilltown.
-
2020
Completion of IFA Submarine Supergrid Project, Interconnection France – United Kingdom
-
2019
Youndé Urban Microgrid Project, Cameroon
-
2019
Building a 400 kV overhead line between Corinthe & Megalopolis,
Greece -
2018
Omexom launches ‘Omexom Institute’, an international network of technical training centers dedicated to the energy sector
-
2018
Creation of the first smart city project in Australia
Canberra, Australia -
2018
Commissioning of SIDRAP, the first wind farm in Indonesia
Sulawesi, Indonesia -
2017
Repowering and securing of the distribution grid following hurricane Irma
St Martin & St Barthélémy, France -
2017
Inauguration by Emmanuel Macron of the largest solar power plant in West Africa, at this date
Zagtouli, Burkina Faso -
2015
Extension of the 380 kV high-voltage station
Gemini offshore wind farm, Netherlands -
2014
Doubling a 98 km long 400 kV line
Výškov & Čechy Střed, Czech Republic -
2013
Completion of the 400 kV line between the stations of Hutton & Quernmore-Tee
Lancaster, United Kingdom -
2013
Start of the restoration of two hydro power plants
Mavuzi & Chicamba, Mozambique -
2009
Opening of the first technical training center, now Omexom Institute, in Korbussen, Germany
-
2003
Completion of one of the biggest private 225 kV transformation stations on the steel plant of Sollac
DK6, Dunkerque, France -
2002
Construction of a 400 kV line connecting the city of Tavel and the nuclear plant of Tricastin
PACA & Languedoc-Roussillon, France
-
2000
Creation of the Omexom Brand
VINCI launches Omexom, a brand specialising in the transmission and transformation of high voltage electricity. -
1817
La Maison Jean and Chabrié wins the contrat for candle-lighting and wood-fire heating for the Palais Bourbon