Who we are ?

Omexom Nuclear Projects (ONP) is the business unit of the Nuclear Division of Vinci Energies dedicated to the electrical installations of the EPR, EDF’s Nuclear new build program.
Our vocation is to design and build the electrical installations of these new Nuclear Power Plants in accordance with the required quality and nuclear safety standards.
The business unit is based in Colombes, close to Paris, but can also rely on its locations in Lyon and Bristol (UK) to address our international projects.

Key figures

  • collaborators
  • M€
    Turnover
  • years
    of expertise
  • Major references
    Flamanville EPR, Hinkley Point C EPR (UK), Activated waste conditioning and storage facility (ICEDA)
  • Our expertises

    • Our engineering specialities are:

      • High & low voltage – single line diagrams, sizing, technical specifications
      • Installation of equipment and cable trays & cable routing (IEG & IED)
      • Seismic stress resistance calculations (supports, etc.)
      • Design & manufacturing of electrical cabinets & boxes
      • K3 qualification of equipment
      • Fire detection (JDT), CCTV/PA, access control, lighting (IED)
      • Instrumentation & Control’s – architectures, functional analyses, specifications
    • The business unit also has strong expertise in Site Management & Construction:

      • Logistics
      • Sourcing
      • Sub-contractors management
      • Scheduling
      • Co-activity management

    Our jobs

    • Project Director,
    • Project Manager,
    • Project Controls Manager,
    • Design Engineer, CAD Designer,
    • Planning Engineer,
    • Construction Manager,
    • QHSSE Manager,
    • Tender Engineer, etc.

    Join us by applying directly on jobs.vinci.com and following us on LinkedIn.

    YR5301 – IEG FA3 (Flamanville 3) EPC contract (including K3 qualification)

    – 2.500 drawings, specifications & other documents
    – 150km of cable trays
    – 2.200km of cables
    – 63.000 terminations
    – 3.000 cabinets & boxes
    – 5 turnkey systems
    > 1.000.000 engineering manhours
    > 5.500.000 site manhours

    ICEDA

    • Control systems, supervision of waste container handling
    • Engineering and installation of cable trays and seismic supports
    • Design and installation of electrical cabinets according to nuclear requirements
    • Radiation protection studies
    • Fire detection system, communication, video surveillance, access control (C2 EVEREST detection gate, CPO SMART, etc)…

    HK5301.01 – IEG HPC Manufacturing & execution design

    Scope :Design, qualification & support to site activities

    – 200km of cable trays

    – 60.000 supports

    – Earthing & bonding

    – Pre design for electrical cabinets & boxes

    – Turnkey systems (KSC, LYS, LAI)

    > 360.000 manhours at 2022 end

    290.000 engineering manhours

    70.000 project controls, quality & project management manhours

    HQSE

    Nuclear safety : ISO 19443
    Quality : ISO 9001
    H&S : ISO 45001
    Fire detection : APSAD I7
    Radiation protection : certification Qualianor
    Qualified by UTO (EDF supply chain management)
    CSR (Corporate social responsibility) : Afnor ISO 26000

    23/10/2025 Finland, Overhead transmission lines

    Omexom Network Powers Cross-Border Collaboration in Järvilinja 1 (Lake Line) Transmission Project in Finland

    Omexom in Finland, in partnership with Omexom in France, is advancing the Järvilinja 1 (Lake Line) transmission project for Fingrid, Finland’s national grid operator.
    Read more
    17/10/2025 Electric mobility, Energy Transition, Germany

    Omexom Delivers Cutting-Edge Electric Bus Charging Infrastructure at Stuttgart’s New SSB Depot for Daimler Buses Solutions 

    On behalf of Daimler Buses Solutions, Omexom in Germany successfully installed a cutting-edge electric bus charging system at the new Gaisburg bus depot in Stuttgart, Germany jointly with Stuttgarter Straßenbahnen AG (SSB). This project represents a significant step forward in promoting climate-neutral transportation.
    Read more
    09/10/2025 Substations, Sweden

    Omexom Breaks Ground on Sweden’s First Wooden Transformer Station in Karlshammar

    On September 24, Omexom and E.ON marked a milestone in sustainable energy infrastructure with the groundbreaking of Sweden’s first transformer station primarily constructed from wood, located in Karlshammar in Mönsterås municipality.
    Read more
    03/10/2025 New Zealand, Outdoor lighting, Territories

    Omexom New Zealand Starts Four-Year Auckland Transport Streetlight Maintenance and Renewals Contract 

    Omexom in New Zealand has been awarded a multifaceted Streetlight Maintenance and Renewals Contract for the Northern area by Auckland Transport. This new contract covers maintenance, renewals, and capital projects.
    Read more
    24/09/2025 Power, Solar, USA

    Gillespie-B1.9 Solar Project Now Energized, Delivering Clean Power to Fayetteville Homes

    Booth and Associates, part of the Omexom network in the USA, has achieved a major milestone in its renewable energy efforts with the successful energization of the Gillespie-B1.9 project, a 1.9 MW distribution-generated solar initiative located in Fayetteville, North Carolina.
    Read more
    17/09/2025 Cameroon, Territories

    Omexom Cameroon and City of Yaoundé Launch Smart Solar Lighting Project for a Sustainable Future

    Omexom Cameroon, in close partnership with the Urban Community of Yaoundé (CUY), officially launched a pilot renewable energy project to modernize the city’s public lighting system. This ambitious initiative marks a major step forward in Cameroon’s energy transition, combining solar power, smart grid technology, and energy storage to enhance sustainability and urban resilience.
    Read more
    11/09/2025 Energy Transition, Substations, Substations, UK & ROI, Germany, Norway

    SF₆-Free Substations: Omexom Business Units Implement Sustainable Innovations for a Greener Grid

    As the demand for clean energy grows, the electrical infrastructure industry is embracing innovative solutions to reduce emissions. SF₆, a widely used greenhouse gas in electrical switchgears at substations, is under scrutiny due to its exceptionally high global warming potential (GWP), more than 24,300 to 25,200 times (*IPCC AR6 data) that of CO₂.
    Read more
    15/02/2024 Norway

    Norway: Otera AS celebrates rebranding, joins Omexom network

    On February 2, Omexom in Norway welcomed close to 300 new colleagues with a rebranding event spread in the locations of Kristiansand, Lyngdal, Evje and Møre.
    Read more
    30/10/2023 Overhead transmission lines, Substations, Sweden

    Omexom in Sweden starts construction on three major projects, marks milestone in collaboration with both TSOs and DSOs

    The Omexom business unit in Sundsvall has secured three new contracts with a total order amount of €70 million. Building on long-standing partnerships with clients Svenska kraftnät and Sundsvall Elnät AB, the projects include the reconstruction and new construction of Odensala which is the largest air-insulated switchgear in Sweden so far.
    Read more
    21/08/2023 Environment, Sweden, Underground distribution lines

    Omexom in Sweden reduces environmental impact in distribution project

    ‘Groundbreaking’ takes on a new meaning at an underground distribution site for Omexom in Sweden:  the business unit and its project partners have inherently redesigned the project to adopt a comprehensive environmental approach.
    Read more