Strengthening Germany’s Gas Transmission Network Through Targeted Asset Modernization
Omexom successfully replaced a DN 500 valve assembly for terranets bw, ensuring network reliability, safety, and long-term operational performance.
Read more
Omexom successfully replaced a DN 500 valve assembly for terranets bw, ensuring network reliability, safety, and long-term operational performance.
Read moreAs offshore wind farms become an increasingly essential component of Europe's renewable energy landscape, operators face a basic challenge: how to preserve the resilience of critical electrical infrastructure in some of the world's most challenging settings.
Read moreOmexom has been awarded a long-term operations and maintenance contract for the substation infrastructure of Baltic Power, marking the company's entry into Poland's first offshore wind farm project.
Read moreIn January 2025, Omexom in Brazil signed an engineering, procurement, and construction (EPC) contract with the Capim Branco Energia Consortium (CCBE). The contract covers the modernization of the protection, control, and instrumentation systems of the Amador Aguiar I and II hydroelectric power plants, which collectively provide 450 MW of installed capacity.
Read moreShae-Lee is the only female Asset Inspector working at Omexom in Australia. She began as a trainee in 2018, and she is now fully qualified and embracing her new role in Asset Services.
Read more