 
            News
- See all
- Architectural lighting
- Asset inspection
- Australia
- Batteries
- Belgium
- Biodiversity
- Brazil
- Cameroon
- Cameroon
- Circular economy
- Climate
- Countries
- Distribution
- Electric mobility
- Energy storage
- Energy Transition
- Environment
- Expertise
- Finland
- France
- Germany
- Greece
- High voltage
- Hydro
- Indonesia
- Innovation
- Low voltage
- Medium voltage
- New Zealand
- Norway
- Nuclear
- Offshore wind
- Omexom Green Story
- Outdoor lighting
- Overhead distribution lines
- Overhead transmission lines
- Portugal
- Power
- Power
- Senegal
- Solar
- Spain
- Sports lighting
- Substations
- Substations
- Sweden
- Territories
- The Netherlands
- Transmission
- UK & ROI, Germany, Norway
- UK and RoI
- Underground distribution lines
- Underground transmission lines
- USA
- Wind
- 
                    Omexom broadens its activities in Finland by welcoming TLT-Building and TLT-ConnectionVINCI Energies acquired two multi-technical companies providing global solutions for electrical and telecommunication network operators in October 2022, and is accelerating their integration with two rebrandings: TLT-Building and TLT-Connection activities in transmission and distribution join Omexom in Finland, while TLT-Connection telecommunication business becomes Axians. Read more
- 
                    Ready for takeoff: Omexom in Portugal finishes first Portuguese solar farm at Faro airportThe only international airport in the Algarve region, Faro welcomes about 9 million passengers yearly. Starting this summer, the airport, operated by VINCI Airports, is expected to self-produce 30% of its energy needs with solar energy and save an equivalent of 1,500 tons/ year of CO2 thanks to its solar farm. The Faro Airport project exemplifies the strength of the VINCI companies’ network, spanning various expertise, including that of Omexom in Portugal. Read more
- 
                    Omexom modernised the Takamaka hydroelectric power plant on Reunion IslandThe Takamaka hydroelectric plant nestles in a tropical valley in Reunion’s national park. The power plant – the island’s primary source of renewable energy – requires modernisation work in which Omexom Montélimar is playing its part. Read more
- 
                    Accelerating nuclear power plant inspections with AIFaced with growing and urgent energy needs, nuclear power plants are increasingly requested and their "availability" is becoming a major issue to secure energy supply. Read more
- 
                    Omexom improves wind farm operations through predictive maintenanceOmexom Renewable Energies Offshore, pioneer in the offshore wind industry, has joined forces with VINCI’s innovation platform Leonard, to develop a data-driven artificial intelligence solution to detect generator failures before they occur. Read more
- 
                    Omexom in Portugal has signed with RWE for the construction of a photovoltaic power plantOmexom Portugal signed an EPC contract with RWE for the construction of a photovoltaic power plant located in South of Portugal, with a capacity of 44 MWac (49 MWp). Read more
- 
                    Omexom in Germany uses airborne wind turbines to generate energyThe use of altitude wind energy through airborne wind turbines enables more and better controllable energy to be generated from wind. Alongside EnBW, SkySails Group and Leibniz Universität Hannover, Omexom is involved in developing this innovation into an everyday companion and making a valuable contribution to the climate-friendly energy system of the future. Read more
- 
                    Three new photovoltaic power plants in IrelandIn Ireland, Omexom's teams in France, in partnership with Omexom in the UK and RoI, have been awarded 3 photovoltaic solar power plant projects for their client Neoen, associated with BNRG. The first Millvale photovoltaic plant was inaugurated on April 29. Read more
- 
                    Episode 9 – Omexom Green Story: Recovering transformer parts and oil in substationsThis episode of the Green Story takes us to Hikiä, Finland, where the local Omexom teams have developed a process to recover transformer parts and oil. In line with one of the three key areas of VINCI Energies’ environmental ambition, Omexom in Finland reduces waste production by reusing transformer oil and spare parts and recycling any leftover materials. Thereby, the team does not only preserve the environment, but has created a service that provides substantial advantages for their customers. Let’s have a look! Read more
- 
                    Tâmega project: Omexom worked in Portugal on the largest hydroelectric complex in Europe in the last 25 yearsLast May, in the Hydroelectric Complex of the Tâmega River, Omexom started working with Iberdrola on the largest hydroelectric project in Europe in the last 25 years. Read more
