News
- See all
- Architectural lighting
- Asset inspection
- Australia
- Batteries
- Belgium
- Biodiversity
- Brazil
- Cameroon
- Cameroon
- Circular economy
- Climate
- Countries
- Distribution
- Electric mobility
- Energy storage
- Energy Transition
- Environment
- Expertise
- Finland
- France
- Germany
- Greece
- High voltage
- Hydro
- Indonesia
- Innovation
- Low voltage
- Medium voltage
- New Zealand
- Norway
- Nuclear
- Offshore wind
- Omexom Green Story
- Outdoor lighting
- Overhead distribution lines
- Overhead transmission lines
- Portugal
- Power
- Power
- Senegal
- Solar
- Spain
- Sports lighting
- Substations
- Substations
- Sweden
- Territories
- The Netherlands
- Transmission
- UK & ROI, Germany, Norway
- UK and RoI
- Underground distribution lines
- Underground transmission lines
- USA
- Wind
-
Environmentally friendly light paths
In Norway, light trails are frequent, they are a balm in the heart for Norwegians who can ski there even when winter darkness has fallen.
Read more -
Meet Melanie Trenker, overhead line fitter at Omexom in Germany
Melanie Trenker is the first woman assembler in the construction of the high-voltage overhead line at Omexom in Germany. What she likes the most about her job: working on the mast, climbing, and being at height. By working at Omexom, she is proud to act for the energy transition
Read more -
Installation of GIS equipment and transformers in two large high-voltage offshore substations
On behalf of HSM Offshore, Omexom in the Netherlands was commissioned to install GIS (Gas Insulated Switchgear) equipment and 66kV and 220kV transformers in two large high-voltage offshore substations.
Read more -
Upgrading Umea’s power grid
Umeå's growth, located in the north-east of Sweden, results in strong demands on a sustainable and reliable power grid. To address this need, the grid owner, Umea Energi Elnat AB, meets this with the project "Spänningshöjning", a comprehensive upgrade of the power network in the region during the period 2015 to 2024.
Read more -
Commissioning of the first 150kV high-voltage system in the Northern Maluku Islands
Omexom in Indonesia has commissioned the first 150kV high-voltage system in the Northern Maluku Islands on behalf of the Indonesian national electricity company. After 24 months of work, the teams have just completed the commissioning of the first 150kV system in Ternate.
Read more -
Largest Synchronous Condenser in Australia
For greater penetration of renewable energies into the Australian energy mix, Omexom has installed and commissioned the first synchronous condenser in Australia, associated with a solar power plant on the Kiamal site.
Read more -
The most powerful battery energy storage system in France
Omexom completed for Total Solar International, in collaboration with the company Saft, a turnkey contract with a 25MW/25MWh storage system: the most powerful electrical energy storage system in metropolitan France.
Read more -
Transmission overhead lines works
Omexom teams in the UK are completing work in Westerstede (Germany) for Omexom in Germany on the 380 kV overhead transmission line from Emden to Conneforde.
Read more -
Development of residential areas in Duisburg-Huckingen
Three business units from Omexom in Germany have been awarded a joint contract to develop a new 170,000 sq. m residential area with 30 housing units in Duisburg. The project includes preparatory work, installation of the district heating system, electrical works, connection to local substations and to the grid, a new gas pipe, installation of LED lighting system.
Read more -
VINCI Energies acquires EWE Offshore Service & Solutions GmbH
Through the Omexom brand, VINCI Energies acquires EWE Offshore Service & Solutions GmbH, a company specialised in project development and in the operation and maintenance of offshore installations.
Read more